Toll Free: 1-800-545-5420
Section Name

Application Rates

Topical Only

Powdered Soiltac® Concentrate
Traffic
Area

Water Additive for Sprayable Dilution

Months
Life
ft²/
lb.

lbs./
ft²
yd²/
lb.
lbs./
yd²
lbs./
acre

Bags/
Acre

m²/
kg

gal./
lb

gal./
Bag

ft²/
gal
.

gal./
acre

L/

L/
kg

L/
Bag

Water Retention Basin & Pond Lining

4

0.25

0.4

2.25

10,890

198

0.8

No

0.6

30

7.3

6,000

5.6

4.6

115

12-24

Aircraft Runways (Heavy use)

7

0.14

0.8

1.29

6,223

113

1.4

Yes

1.0

53

7.3

6,000

5.6

8.0

201

12-24

Aircraft Runways (single engine)

10

0.10

1.1

0.90

4,356

79

2.0

Yes

1.4

76

7.3

6,000

5.6

11.5

287

12-24

Helicopter Landing Pads (Heavy Craft)

9

0.11

1.0

1.00

4,840

88

1.8

Yes

1.2

68

7.3

6,000

5.6

10.3

258

12-24

Helicopter Landing Pads (Light Craft)

14

0.07

1.6

0.64

3,111

57

2.9

Yes

1.6

88

8.7

5,000

4.7

13.4

335

12-24

Heavy Haul Roads & Mining Roads

12

0.08

1.3

0.75

3,630

66

2.5

Yes

1.4

76

8.7

5,000

4.7

11.5

287

12-24

Military Convoy & Supply Roads

13

0.08

1.4

0.69

3,351

61

2.7

Yes

1.3

74

9.7

4,500

4.2

11.2

280

12-25

Roads (High Traffic)

13

0.08

1.4

0.69

3,351

61

2.7

Yes

1.3

74

9.7

4,500

4.2

11.2

280

12-24

Residential Driveways

13

0.08

1.4

0.69

3,351

61

2.7

Yes

1.3

74

9.7

4,500

4.2

11.2

280

12-24

Parking Lots

13

0.08

1.4

0.69

3,351

61

2.7

Yes

1.3

74

9.7

4,500

4.2

11.2

280

12-24

Roads (Light Traffic)

14

0.07

1.6

0.64

3,111

57

2.9

Yes

1.4

80

9.7

4,500

4.2

12.0

301

12-24

Golf Course Bunker Liner

10

0.100

1.1

0.90

4,356

79

2.0

Yes

1.1

63

8.7

5,000

4.7

9.6

239

12-24

Golf Course Cart Paths

16

0.063

1.8

0.56

2,723

50

3.3

Yes

1.8

101

8.7

5,000

4.7

15.3

382

12-25

Walking Trails and Paths

20

0.050

2.2

0.45

2,178

40

4.1

Yes

2.1

114

9.7

4,500

4.2

17.2

430

12-24

Road Sealer over Soiltac Stabilized Base

20

0.050

2.2

0.45

2,178

40

4.1

Yes

0.9

51

21.8

2,000

1.9

7.6

191

12-27

BMX Tracks

24

0.042

2.7

0.38

1,815

33

4.9

Yes

2.2

121

10.9

4,000

3.7

18.4

459

12-26

Temporary Parking Lots

24

0.042

2.7

0.38

1,815

33

4.9

Yes

2.2

121

10.9

4,000

3.7

18.4

459

12-25

Temporary Roads & Detours

30

0.033

3.3

0.30

1,452

26

6.1

Yes

2.8

152

10.9

4,000

3.7

22.9

574

12-25

Road Shoulders

32

0.031

3.6

0.28

1,361

25

6.6

Yes

2.9

162

10.9

4,000

3.7

24.5

612

12-27

Slope Erosion Control (Steep Slope)

20

0.050

2.2

0.45

2,178

40

4.1

No

1.1

63

17.4

2,500

2.3

9.6

239

12-24

Slope Erosion Control (Average Slope)

36

0.028

4.0

0.25

1,210

22

7.4

No

2.1

114

17.4

2,500

2.3

17.2

430

12-24

Slope Erosion Control (Light Slope)

44

0.023

4.9

0.20

990

18

9.0

No

2.5

139

17.4

2,500

2.3

21.0

526

12-24

Stock Pile Dust Capping (Steep Slope)

44

0.023

4.9

0.20

990

18

9.0

No

2.0

111

21.8

2,000

1.9

16.8

421

12-24

Stock Pile Dust Capping (Average Slope)

54

0.019

6.0

0.17

807

15

11.1

No

2.5

136

21.8

2,000

1.9

20.6

516

12-24

Stock Pile Dust Capping (Light Slope)

64

0.016

7.1

0.14

681

12

13.1

No

2.9

162

21.8

2,000

1.9

24.5

612

12-24

Hazardous Material Capping & Sealing

32

0.031

3.6

0.28

1,361

25

6.6

No

1.8

101

17.4

2,500

2.3

15.3

382

3-9

Landfill Capping & Reclamation

72

0.014

8.0

0.13

605

11

14.7

No

2.5

136

29.0

1,500

1.4

20.6

516

3-8

Odor & Vapor Suppression

72

0.014

8.0

0.13

605

11

14.7

No

4.1

227

17.4

2,500

2.3

34.4

860

3-10

Mine Tailings Capping & Reclamation

90

0.011

10.0

0.10

484

9

18.4

No

3.1

170

29.0

1,500

1.4

25.8

645

3-7

Coal Rail Car Capping

200

0.005

22.2

0.05

218

4

41.0

No

6.9

379

29.0

1,500

1.4

57.4

1,434

3-7

Dust Control (30 Days)

250

0.004

27.8

0.04

174

3

51.2

No

6.9

379

36.3

1,200

1.1

57.4

1,434

1+

Dust Control (90 days)

159

0.006

17.7

0.06

274

5

32.6

No

4.4

241

36.3

1,200

1.1

36.5

912

3+

Dust Control (6 Months)

116

0.009

12.9

0.08

376

7

23.8

No

3.2

176

36.3

1,200

1.1

26.6

665

6+

Dust Control (12 Months)

83

0.012

9.2

0.11

525

10

17.0

No

2.3

126

36.3

1,200

1.1

19.0

476

12+

Dust Control (12-24 Months)

64

0.016

7.1

0.14

681

12

13.1

No

1.8

97

36.3

1,200

1.1

14.7

367

12-24

Hydroseed & Hydromulch Tackifier

348

0.003

38.7

0.03

125

2

71.3

No

8.0

439

43.6

1,000

0.9

66.5

1,663

3-6


Mixed-In / Processed** (by Surface Area)

ft²/lb.

lbs./ft²

yd²/lb.

lbs./yd²

lbs./acre

ft²/Bag

yd²/Bag

m²/Bag

Bags/Acre

m²/kg

Base Stabilization Light (4"-10cm deep)

9

0.11

1.00

1.00

4,840

495

55

46

88

1.8

Base Stabilization Average (4"-10cm deep)

7

0.14

0.78

1.29

6,223

385

43

36

113

1.4

Base Stabilization Heavy (4"-10cm deep)

5

0.20

0.56

1.80

8,712

275

31

26

158

1.0

Road Pot Hole Repair (4"-10cm deep)

5

0.20

0.56

1.80

8,712

275

31

26

158

1.0

Adobe Blocks & Earth Blocks (6"-15cm Height)

7

0.14

0.78

1.29

6,223

385

43

36

113

1.4

Base Stabilization Light (6"-15cm deep)

7

0.14

0.78

1.29

6,223

385

43

36

113

1.4

Base Stabilization Average (6"-15cm deep)

5

0.20

0.56

1.80

8,712

275

31

26

158

1.0

Base Stabilization Heavy (6"-15cm deep)

3

0.33

0.33

3.00

14,520

165

18

15

264

0.6


Mixed-In / Processed** (by Volume)

ft³/lb.

lbs./ft³

yd³/lb.

lbs./yd³

m³/kg

ft³/Bag

yd³/Bag

m³/Bag

Base Stabilization Light

3.50

0.29

0.13

8

0.22

193

7

5.5

Base Stabilization Average

2.50

0.40

0.09

11

0.16

138

5

3.9

Base Stabilization Heavy

1.50

0.67

0.06

18

0.09

83

3

2.3

**Dilution rates for mix-in/processed applications are based on the difference between optimum moisture (OMC) and in-situ moisture levels.
Please consult with your local Powdered Soiltac® representative to calculate recommended dilution rates for all mix-in applications.

Application coverage and dilution rates may vary depending on traffic volume, load bearing capacity, soil type, weather conditions, soil moisture levels and compaction. All Mixed-in/Processed applications require laboratory and on-site testing to determine optimal application and dilution rates.